First of two contracts. The first contract was for site preparation of 89 acres for a 600 MW C-C power plant. Work included 780,000 cubic yards of excavation 3,300 linear feet of trench drain, 436,000 square feet of clay liner, and 99,000 square feet of HDPE liner. The second contract included structural excavation and backfill, sub-grade preparation road construction, and underground utility installations. Work included 85,000 cubic yards of earthwork, 35,600 cubic yards of aggregate processing, 10,000 linear feet of pipe, and 16,745 cubic yards of asphalt pavement.